loader image

WORK FOR INSTALLATION OF ELEVATORS

Assembly, and adaptation of structures for elevators and vertical access solutions in buildings.

Our Experience

We handle the entire technical and structural process to ensure your elevator installation is flawless, from adapting the shaft to the final support structure.

FREQUENTLY ASKED QUESTIONS

What does the work for the installation of an elevator include?

Installing Stiltz or Cibes equipment requires minimal work: only a small cut in the floor/ceiling and a standard single-phase electrical connection. There's no need to construct a deep pit or a dedicated machine room.

How long does it take to install an elevator?

Because they don't require a machine room, the civil works are drastically reduced and can be completed in just 2 or 3 days. Equipment installation typically takes another 48 hours, allowing the elevator to be operational in less than a week.

How much does it cost to install an elevator?

The construction cost is significantly lower than that of a traditional elevator, as it eliminates the expenses of pit excavation and machine room construction. The budget focuses almost exclusively on the aesthetic improvement of the space where the elevator is installed.
se ubicará el equipo.

Does the project itself include the installation of the elevator?

Yes, at Obralift we offer a comprehensive solution. We handle the minimal structural modifications required and the expert assembly of the self-supporting equipment, delivering the system ready to use without intermediaries. 

What permits or procedures need to be handled before the construction work begins?

Although the work is minor, it is recommended to inform the city council or building management company. Since the equipment does not significantly alter the building's structure, the procedures are much quicker and simpler than for a conventional installation.

Is it necessary to coordinate the work with the elevator installation company?

Since we handle the adaptation and installation of the Cibes or Stiltz equipment ourselves, coordination is seamless and there is no margin for error. This guarantees that the equipment fits perfectly in the prepared space.